Case Study: Expedited Repair Saves Refinery Downtime

While Hydro was repairing a petroleum refinery’s decoker pump, an emergency caused the refinery’s backup pump to fail.

The refinery, faced with a critical situation, turned to Hydro for help. Hydro was able to expedite the repair process and spare the refinery a lengthy downtime and costly situation.

Posted in Case Studies and tagged , , , .