Hydro Parts Solutions recently provided a cast nozzle head to a Canadian oil and gas end-user. As is standard with Hydro’s cast parts, this complex component was:
A nuclear utility had a large circulating water pump with severe vibration issues that required refurbishment in an emergency time frame. Hydro’s Aston, PA service center, which has a 50-ton crane and a history of providing quality repair for nuclear non-safety related equipment, was chosen for this work. Despite the unique challenges in machining and maneuverability presented by large pumps, the DCI and refurbishment were performed in under 2 weeks. Continue reading →
Hydro was called on to reverse engineer a large circulating water pump in the Caribbean to supply parts for refurbishment. The lead times for receiving parts from the original equipment manufacturer (OEM) were excessive. More concerning, the suction bell provided by the OEM had failed during service. All internal ribs were lost, and the bearing holder was found loose within the assembly. Continue reading →
A major county in California found itself in a crisis when its irrigation pumps could not produce the required performance, cutting off critical water supply to the reservoirs and aqueducts. These pumps suffered from high vibration and repeated failures characterized by extreme wear to the propellers, shafts, and bearings.
State of the Art Parts: A Gulf Coast refinery had the primary pump for a critical system at the HydroTex Golden Triangle facility for refurbishment. While the primary pump was in the shop, the backup pump operating on-site began to show signs of failure. The impeller of the pump being repaired had extreme wear and was unable to be reused. The shop needed to source an impeller in an expedited timeframe to complete the repair ahead of schedule and get the primary pump back in service before the backup pump failed. Continue reading →