HydroAire Basic Hydraulics Training (Seminar; Reservations Closed)

Presented by Bob Jennings, Basic Hydraulics is a 1-day course on hydraulic principles of operation for centrifugal pumps with a focus on the correlation between the centrifugal pump performance and the system head curve.

This course is designed for maintenance supervisors, maintenance foreman, consulting engineers, system engineers, process design engineers, and anyone else who is involved with the selection, operation or maintenance of pumping equipment and systems.

HydroAire Basic Hydraulics Training (Seminar)

Presented by Bob Jennings, Basic Hydraulics is a 1-day course on hydraulic principles of operation for centrifugal pumps with a focus on the correlation between the centrifugal pump performance and the system head curve.

This course is designed for maintenance supervisors, maintenance foreman, consulting engineers, system engineers, process design engineers, and anyone else who is involved with the selection, operation or maintenance of pumping equipment and systems.

Root Cause Analysis Uncovers Casting Defects

Efficiency and reliability are at the forefront of a successful pumping system. As such, unplanned outages can be a detrimental disturbance to the overall operation. In this case, the end user’s high pressure multistage  BB5 barrel pump was experiencing severe vibration, unstable performance, and failure in the field leading to unit shutdown.

This particular unit, used in boiler feedwater operations, is critical to the plant’s uptime and throughput. Furthermore, continued failures can cause growing costs due to inevitable maintenance and repairs, often overlooking a long term solution. With each unplanned outage, the plant could face a significant loss in capital.

Previously, the pump had been running for six months before experiencing catastrophic failure, requiring a shutdown and removal for further analysis. Initially, the unit’s damaged components were repaired by welding, and the volute was reassembled and installed for use. Upon its installation, the power plant placed the unit back into service but encountered a second emergency shutdown after two months in operation.

Video: https://vimeo.com/362808909

Source: https://www.pumpsandsystems.com/root-cause-analysis-uncovers-casting-defects-critical-boiler-feedwater-unit